Proton Facility Economics: Single-Room Centers.
other · Level V
Where this comes from
- Record sourced from PubMed, PMID 30158085.
- Also identified by DOI 10.1016/j.jacr.2018.07.020.
- No licence information is recorded for this record.
- Because redistribution is not established, this page shows the abstract only. Follow the links below for the full text.
Abstract
We have previously described the central nature of simple cases for financial feasibility of proton beam therapy centers-especially four- to five-room centers. In the 5 years since that publication, such construction has slowed drastically, and smaller, single-room projects are in vogue. We now seek to show under what circumstances a single-room system is optimally financially viable. A "standard" construction cost and debt for a single gantry system of $40 million was presumed, with 75% of the construction funded through standard 20-year financing. We then modeled a statistical analysis, deriving the optimal case mix required daily to cover construction and debt service costs. We previously published that a single gantry treating only complex patients would need to apply 85% of its treatment slots simply to service debt, though it would cover its debt treating 4 hours of simple patients. As the business model has changed, debt maintenance, profit and operational costs have somewhat reduced the business case for adding a large number of simple patients. Debt maintenance is possible with as little as 13% of daily patients for a 40% Medicare case mix, but these numbers are critically sensitive to continued patient throughput. Even in a single-room system, reducing overall debt, using tax-exempt financing, and having a case load emphasizing simple, private payer patients is paramount to fiscal health of the facility. Unused capacity is a huge risk if insufficient patients are available.
Medical subject headings
- Delivery of Health Care
- Hospital Design and Construction
- Proton Therapy