Constructing high-quality rest facilities to maximise performance and ensure patient safety.
other · Level V
Where this comes from
- Record sourced from PubMed, PMID 34301729.
- Also identified by DOI 10.1136/bmjoq-2021-001403 and PMC identifier 8311328.
- Licence recorded as CC BY-NC.
- Because redistribution is not established, this page shows the abstract only. Follow the links below for the full text.
Abstract
Junior doctors are working in an increasingly overstretched National Health Service. In 2018, Kettering General Hospital (KGH) was awarded £60 800 of government funds to create high-quality rest facilities and improve junior doctor well-being. An audit and survey in KGH identified the structural and functional improvements needed. From November 2019 to June 2020, £47 841.24 was spent on creating new rest facilities. On completion, a postaction review assessed how the changes impacted morale, well-being and quality of patient care. The majority of doctors were happy with the new rest areas (60%), a majority felt that they would use the on-call room area (63%) and the renovation improved morale and well-being. There was an increased ability to take breaks. However, the majority of doctors are not exception-reporting missing breaks: 79% (2019), 74% (2020). This report recommends the maintenance of increased staffing levels and rest facilities during the recovery phase of COVID-19. The remaining £12 958.76 should be directed at sustaining the quality of KGH rest facilities. Lastly, the rate of exception-reporting must be increased through improving awareness, exploring alternative methods and supporting the action when necessary. The continual investment into rest facilities ensures workforce well-being and translates into patient safety.
Medical subject headings
- Fatigue
- Hospital Design and Construction
- Medical Staff, Hospital
- Shift Work Schedule
- Sleep