A heijunka study for the production of standard parts included in a customized finished product.
other
Where this comes from
- Record sourced from PubMed, PMID 34855820.
- Also identified by DOI 10.1371/journal.pone.0260515 and PMC identifier 8638910.
- No licence information is recorded for this record.
- Because redistribution is not established, this page shows the abstract only. Follow the links below for the full text.
Abstract
Efficient order execution plays a crucial role in the activity of every company. In production planning it is important to find a balance between the fluctuations of orders and stability of production flow regarding the company. One of the methods of achieving this goal is heijunka (production leveling). This paper presents a study of choosing the best variant of the production planning and control system for the production of standard parts. Three variants are investigated regarding delays in order delivery. The analysis of variants was conducted using a simulation method. The method of choosing the best variant for the production system being investigated is also proposed. The results show that the best variant is a mix of production leveling and production "for stock".
Medical subject headings
- Computer Simulation