Multi-resource dynamic coordinated planning of flexible distribution network.
Where this comes from
- Record sourced from PubMed, PMID 38811553.
- Also identified by DOI 10.1038/s41467-024-48862-5 and PMC identifier 11530552.
- Licence recorded as CC BY.
- The licence permits redistribution, so the abstract is shown in full and the full text is available from the publisher.
Abstract
The flexible distribution network presents a promising architecture to accommodate highly integrated distributed generators and increasing loads in an efficient and cost-effective way. The distribution network is characterised by flexible interconnections and expansions based on soft open points, which enables it to dispatch power flow over the entire system with enhanced controllability and compatibility. Herein, we propose a multi-resource dynamic coordinated planning method of flexible distribution network that allows allocation strategies to be determined over a long-term planning period. Additionally, we establish a probabilistic framework to address source-load uncertainties, which mitigates the security risks of voltage violations and line overloads. A practical distribution network is adopted for flexible upgrading based on soft open points, and its cost benefits are evaluated and compared with that of traditional planning approaches. By adjusting the acceptable violation probability in chance constraints, a trade-off between investment efficiency and operational security can be realised.