Accelerating transmission capacity expansion by using advanced conductors in existing right-of-way.
other
Where this comes from
- Record sourced from PubMed, PMID 39312665.
- Also identified by DOI 10.1073/pnas.2411207121 and PMC identifier 11459140.
- Licence recorded as CC BY.
- The licence permits redistribution, so the abstract is shown in full and the full text is available from the publisher.
Abstract
As countries pursue decarbonization goals, the rapid expansion of transmission capacity for renewable energy (RE) integration poses a significant challenge due to hurdles such as permitting and cost allocation. However, we find that large-scale reconductoring with advanced composite-core conductors can cost-effectively double transmission capacity within existing right-of-way, with limited additional permitting. This strategy unlocks a high availability of increasingly economically viable RE resources in close proximity to the existing network. We implement reconductoring in a model of the US power system, showing that reconductoring can help meet over 80% of the new interzonal transmission needed to reach over 90% clean electricity by 2035 given restrictions on greenfield transmission build-out. With $180 billion in system cost savings by 2050, reconductoring presents a cost-effective and time-efficient, yet underutilized, opportunity to accelerate global transmission expansion.