Vulnerabilities, extreme weather and temporal tensions as experienced by construction workers in the Swedish construction sector.
Where this comes from
- Record sourced from PubMed, PMID 42030273.
- Also identified by DOI 10.1371/journal.pone.0345707 and PMC identifier 13108760.
- No licence information is recorded for this record.
- Because redistribution is not established, this page shows the abstract only. Follow the links below for the full text.
Abstract
Climate change poses increasing risks to outdoor occupations, including construction work. This study explores how vulnerability is constructed in narratives of manual labour within the Swedish construction sector, particularly under extreme weather conditions. Drawing on 16 qualitative interviews with Swedish construction workers, the study adopts a social constructionist lens to explore how vulnerability is shaped and experienced. The findings identify multiple, intersecting forms of vulnerability-bodily, hierarchical, material, social, and market-driven-exacerbated by climate-related challenges such as high temperatures, heavy rainfall, and strong winds. Crucially, the analysis highlights how extreme weather disrupts temporal rhythms, widening the gap between scheduled work plans and the actual time needed to complete tasks. The paper concludes that vulnerability arises not only from direct exposure to adverse weather, but also through indirect social, material, and temporal dynamics inherent in the construction sector and exacerbated by climate change.
Medical subject headings
- Construction Industry
- Extreme Weather